Value: $0.3 Mill
Construction Period: June 2018 – August 2018
Location: Bungonia NSW
The Multiquip Quarries are used to produce aggregates of sand and basalt that is ultimately used in the production of concrete and asphalt alongside materials used in road construction. Our contribution to the project was the construction of various auxiliary walls for the new screen and wash plant within the plant. The structures erected were 7 metre high radius walls with a width of 1 metre and 5.5 metre high walls for screen wheel ramps.